13164 train HATE BAZARE EXP

13164 starts from SHC (Saharsa JN) at 14:15 and reaches SDAH (Sealdah) at 05:15 covering a distance of 595 kms and 30 stations. 13164 is scheduled to run on Sun, Mon, Tue, Thu, Sat at 14:15 from SHC Saharsa JN station to reach SDAH Sealdah at 05:15.

13164 train route, schedule and stations time table

CodeDayArrivalDepartsHaltKMsStation
SHC114:1514:1500Saharsa JN
SBV114:3214:34217S Bhakhtiyarpur
KFA114:4114:43223Koparia
MNE115:2816:003245Mansi JN
MSK116:0816:10255Mahes Khunt
NNR116:4216:44279Narayanpur
THB116:5216:54287Thana Bihpur JN
NNA117:0817:102103Naugachia
KUE117:3617:382120Kursela
CRR118:0318:052137Karagola Road
SMO118:1618:182148Semapur
KIR119:0019:1515160Katihar JN
LAV119:5019:522183Labha
KDPR120:1020:122189Kumedpur
HCR120:2320:252195Harischandrpur
BKRD120:3520:372205Bhaluka Road F
SM120:5520:572216Samsi
EKI121:4521:472231Eklakhi
MLDT122:3022:4010250Malda Town
NFK123:1223:142285NEW Farakka JN
NILE123:3723:392313Nimitita
JRLE123:5623:582332Jangipur Road
AZ200:4500:538368Azimganj JN
KGLE201:0701:092382Khagraghat Road
KWAE201:5401:595440Katwa
NDAE202:2702:325480Nabadwip Dham
ABKA202:5002:522503Ambika Kalna
BDC203:3003:355545Bandel
NH204:0304:085555Naihati JN
SDAH205:1505:150595Sealdah

13164 chart preparation time

13164 chart preparation time today is 06:15 (06:15 AM) for the train starting from Saharsa JN at 14:15.

Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.

The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.

Train data refreshed on: