07055 train SC AKP SPL
07055 starts from SC (Secunderabad JN) at 22:10 and reaches AKP (Anakapalle) at 11:00 covering a distance of 630 kms and 18 stations. 07055 is scheduled to run on Thu at 22:10 from SC Secunderabad JN station to reach AKP Anakapalle at 11:00.
- Train Number: 07055 Name: SC AKP SPL (सिकिन्देरबद् अनकपल्ल्)
- Chart preparation time: same day at 13:29
- Type: TOD (TRAIN ON DEMAND) covering 630 kms in 12 hours 50 mins
- Frequency: Runs 1 days Thu
- Route: Secunderabad JN (SC) to Anakapalle (AKP).
- Major Stops: GNT (Guntur JN), BZA (Vijayawada JN), RJY (Rajamundry)
- Coaches: 2 Second Sitting, 8 Sleeper Class, 8 Third AC, 1 Second AC, 1 First AC, 2 2nd & 3rd AC
07055 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| SC | 1 | 22:10 | 22:10 | 0 | 0 | Secunderabad JN |
| CHZ | 1 | 22:28 | 22:30 | 2 | 12 | Charlapalli |
| NLDA | 1 | 23:48 | 23:50 | 2 | 109 | Nalgonda |
| MRGA | 2 | 00:24 | 00:25 | 1 | 147 | Miryalaguda |
| NDKD | 2 | 00:55 | 00:56 | 1 | 185 | Nadikode |
| PGRL | 2 | 01:28 | 01:30 | 2 | 206 | Piduguralla |
| SAP | 2 | 02:08 | 02:10 | 2 | 238 | Sattenapalle |
| GNT | 2 | 03:00 | 03:10 | 10 | 280 | Guntur JN |
| BZA | 2 | 04:10 | 04:20 | 10 | 313 | Vijayawada JN |
| EE | 2 | 05:08 | 05:10 | 2 | 373 | Eluru |
| TDD | 2 | 05:38 | 05:40 | 2 | 421 | Tadepalligudem |
| NDD | 2 | 05:55 | 05:56 | 1 | 440 | Nidadavolu JN |
| RJY | 2 | 06:30 | 06:40 | 10 | 463 | Rajamundry |
| SLO | 2 | 07:23 | 07:25 | 2 | 513 | Samalkot JN |
| ANV | 2 | 07:58 | 08:00 | 2 | 550 | Annavaram |
| TUNI | 2 | 08:23 | 08:25 | 2 | 566 | Tuni |
| YLM | 2 | 08:57 | 08:58 | 1 | 606 | Elamanchili |
| AKP | 2 | 11:00 | 11:00 | 0 | 630 | Anakapalle |
07055 chart preparation time
07055 chart preparation time today is 13:29 (01:29 PM) for the train starting from Secunderabad JN at 22:10.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: