04715 train BKN-SNSI EXP SPL

04715 starts from BKN (Bikaner JN) at 13:30 and reaches SNSI (Sainagar Shirdi) at 19:00 covering a distance of 1746 kms and 25 stations. 04715 is scheduled to run on Sat at 13:30 from BKN Bikaner JN station to reach SNSI Sainagar Shirdi at 19:00.

04715 train route, schedule and stations time table

CodeDayArrivalDepartsHaltKMsStation
BKN113:3013:3000Bikaner JN
SDGH114:2014:22273SRI Dungargarh
RJR114:5514:572120Rajaldesar
RTGH115:0715:103137Ratangarh JN
CUR116:2516:3510180Churu
FPS117:1317:152223Fatehpur-Shekhawati
LNH117:3117:332243Lachhman Garh Sikar
SIKR118:0018:055270Sikar JN
RGS118:5719:003320Ringas JN
DKBJ119:3719:403374Dahar KA Balaji
JP120:0020:1010378Jaipur JN
DPA120:2420:273385Durgapura
SWM122:2522:4015509Sawai Madhopur JN
KOTA123:5323:585617Kota JN
RMA200:5300:552689Ramganj Mandi
SGZ201:3801:402750Shamgarh
NAD203:2003:3212842Nagda JN
UJN204:4004:455897Ujjain JN
BPL207:5008:00101083Bhopal JN
ET209:4009:4551175Itarsi JN
HD210:3010:3221250Harda
KNW212:2712:3031357Khandwa Junction
BSL214:3514:4051480Bhusaval JN
MMR217:0017:0551664Manmad JN
SNSI219:0019:0001747Sainagar Shirdi

04715 chart preparation time

04715 chart preparation time was 23:06 (11:06 PM) last night, as it is prepared a day before for the train starting today from Bikaner JN at 13:30.

Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.

The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.

Train data refreshed on: