15182 train LTT MAU EXPRESS
15182 starts from LTT (Lokmanyatilak) at 11:10 and reaches MAU (MAU JN) at 18:30 covering a distance of 1592 kms and 22 stations. 15182 is scheduled to run on Mon at 11:10 from LTT Lokmanyatilak station to reach MAU MAU JN at 18:30.
- Train Number: 15182 Name: LTT MAU EXPRESS (लोकमान्य तिलक मउु मेएक्स)
- Chart preparation time: prev day at 20:57
- Type: MEX (MAIL EXPRESS) covering 1592 kms in 31 hours 20 mins
- Frequency: Runs 1 days Mon
- Route: Lokmanyatilak (LTT) to MAU JN (MAU).
- Major Stops: BSL (Bhusaval JN), ET (Itarsi JN), JBP (Jabalpur), STA (Satna), PRYJ (Prayagraj JN), SHG (Shahganj JN), AMH (Azamgarh)
- Coaches: 1 Luggage & Parcel, 5 Sleeper Class, 6 Third AC, 2 AC 3 Economy, 2 Second AC, 1 1st & 2nd AC
15182 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| LTT | 1 | 11:10 | 11:10 | 0 | 0 | Lokmanyatilak |
| KYN | 1 | 11:57 | 12:00 | 3 | 37 | Kalyan JN |
| NK | 1 | 14:37 | 14:40 | 3 | 171 | Nasik Road |
| JL | 1 | 17:28 | 17:30 | 2 | 404 | Jalgaon JN |
| BSL | 1 | 17:55 | 18:00 | 5 | 428 | Bhusaval JN |
| HD | 1 | 21:05 | 21:07 | 2 | 658 | Harda |
| ET | 1 | 22:25 | 22:35 | 10 | 734 | Itarsi JN |
| JBP | 2 | 01:25 | 01:35 | 10 | 979 | Jabalpur |
| KTE | 2 | 02:58 | 03:00 | 2 | 1069 | Katni |
| STA | 2 | 04:25 | 04:30 | 5 | 1168 | Satna |
| MKP | 2 | 06:10 | 06:12 | 2 | 1245 | Manikpur JN |
| PRYJ | 2 | 08:35 | 09:00 | 25 | 1346 | Prayagraj JN |
| PRG | 2 | 09:16 | 09:18 | 2 | 1352 | Prayag |
| PLP | 2 | 10:28 | 10:30 | 2 | 1382 | Phulpur |
| JNH | 2 | 11:48 | 11:50 | 2 | 1405 | Janghai JN |
| MAY | 2 | 12:36 | 12:38 | 2 | 1435 | Mariahu |
| JNU | 2 | 13:43 | 13:45 | 2 | 1460 | Jaunpur JN |
| SHG | 2 | 15:20 | 15:25 | 5 | 1493 | Shahganj JN |
| KRND | 2 | 16:10 | 16:12 | 2 | 1515 | Khorason Road |
| AMH | 2 | 17:10 | 17:15 | 5 | 1550 | Azamgarh |
| MMA | 2 | 17:50 | 17:52 | 2 | 1571 | Muhammadabad |
| MAU | 2 | 18:30 | 18:30 | 0 | 1593 | MAU JN |
15182 chart preparation time
15182 chart preparation time was 20:57 (08:57 PM) last night, as it is prepared a day before for the train starting today from Lokmanyatilak at 11:10.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: