12240 train MMCT DURONTO EXP
12240 starts from HSR (Hisar) at 10:10 and reaches MMCT (Mumbai Central) at 08:20 covering a distance of 1504 kms and 12 stations. 12240 is scheduled to run on Tue, Thu at 10:10 from HSR Hisar station to reach MMCT Mumbai Central at 08:20.
- Train Number: 12240 Name: MMCT DURONTO EXP (हिसार मुम्बई सेन्त्रल दुरन्तो एक्सप्रेस)
- Chart preparation time: prev day at 22:32
- Type: DRNT (DURONTO EXPRESS) covering 1504 kms in 22 hours 10 mins
- Frequency: Runs 2 days Tue Thu
- Route: Hisar (HSR) to Mumbai Central (MMCT).
- Major Stops: SDLP (Sadulpur JN), SIKR (Sikar JN), JP (Jaipur JN), SWM (Sawai Madhopur JN), KOTA (Kota JN), RTM (Ratlam JN), BRC (Vadodara JN)
- Coaches: 6 Third AC, 4 AC 3 Economy, 3 Second AC, 1 First AC
- Engine reversal stations (coaches direction): SDLP (Sadulpur JN), SWM (Sawai Madhopur JN)
12240 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| HSR | 1 | 10:10 | 10:10 | 0 | 0 | Hisar |
| SDLP | 1 | 11:40 | 12:05 | 25 | 71 | Sadulpur JN |
| LHU | 1 | 12:57 | 13:00 | 3 | 120 | Loharu |
| JJN | 1 | 13:41 | 13:43 | 2 | 178 | Jhunjhunu |
| SIKR | 1 | 14:28 | 14:33 | 5 | 242 | Sikar JN |
| RGS | 1 | 15:25 | 15:28 | 3 | 292 | Ringas JN |
| JP | 1 | 16:25 | 16:35 | 10 | 349 | Jaipur JN |
| SWM | 1 | 18:35 | 18:55 | 20 | 481 | Sawai Madhopur JN |
| KOTA | 1 | 20:05 | 20:10 | 5 | 589 | Kota JN |
| RTM | 1 | 23:30 | 23:35 | 5 | 855 | Ratlam JN |
| BRC | 2 | 03:00 | 03:08 | 8 | 1112 | Vadodara JN |
| MMCT | 2 | 08:20 | 08:20 | 0 | 1504 | Mumbai Central |
12240 chart preparation time
12240 chart preparation time was 22:32 (10:32 PM) last night, as it is prepared a day before for the train starting today from Hisar at 10:10.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: