03309 train DHN DLI SPL
03309 starts from DHN (Dhanbad JN) at 10:10 and reaches DLI (Delhi JN) at 09:15 covering a distance of 1174 kms and 16 stations. 03309 is scheduled to run on Tue, Sat at 10:10 from DHN Dhanbad JN station to reach DLI Delhi JN at 09:15.
- Train Number: 03309 Name: DHN DLI SPL (धनबाद दिल्ली एक्सप्रेस स्पेशल)
- Type: TOD (TRAIN ON DEMAND) covering 1174 kms in 23 hours 05 mins
- Frequency: Runs 2 days Tue Sat
- Route: Dhanbad JN (DHN) to Delhi JN (DLI).
- Major Stops: DDU (Ptdeen Dayal Upadhyaya JN), BSB (Varanasi), PRYJ (Prayagraj JN), GOY (Govindpuri), TDL (Tundla JN)
- Coaches: Coach details will be available once the train schedule is finalized.
03309 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| DHN | 1 | 10:10 | 10:10 | 0 | 0 | Dhanbad JN |
| GMO | 1 | 10:35 | 10:37 | 2 | 30 | NSC Bose J Gomo |
| PNME | 1 | 10:50 | 10:52 | 2 | 48 | Parasnath |
| HZD | 1 | 11:12 | 11:14 | 2 | 75 | Hazaribagh RD |
| KQR | 1 | 11:42 | 11:44 | 2 | 123 | Koderma |
| GAYA | 1 | 13:30 | 13:35 | 5 | 199 | Gaya JN |
| AUBR | 1 | 14:24 | 14:26 | 2 | 268 | Anugraha N Road |
| DOS | 1 | 14:40 | 14:42 | 2 | 284 | Dehri ON Sone |
| SSM | 1 | 14:54 | 14:56 | 2 | 302 | Sasaram |
| BBU | 1 | 15:35 | 15:37 | 2 | 350 | Bhabua Road |
| DDU | 1 | 17:00 | 17:10 | 10 | 403 | Ptdeen Dayal Upadhyaya JN |
| BSB | 1 | 18:05 | 18:15 | 10 | 421 | Varanasi |
| PRYJ | 1 | 21:00 | 21:10 | 10 | 546 | Prayagraj JN |
| GOY | 2 | 00:10 | 00:20 | 10 | 743 | Govindpuri |
| TDL | 2 | 05:15 | 05:25 | 10 | 970 | Tundla JN |
| DLI | 2 | 09:15 | 09:15 | 0 | 1174 | Delhi JN |
03309 chart preparation time
The first reservation chart for 03309 is usually prepared by 08:00 PM on the previous evening. For its scheduled departure at 10:10 from Dhanbad JN, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: