02842 train MAS SHM SPL
02842 starts from MAS (Puratchi Thalaivar DR MGR CTL) at 04:30 and reaches SHM (Shalimar) at 11:20 covering a distance of 1646 kms and 18 stations. 02842 is scheduled to run on Wed at 04:30 from MAS Puratchi Thalaivar DR MGR CTL station to reach SHM Shalimar at 11:20.
- Train Number: 02842 Name: MAS SHM SPL (चेन्नई शालिमार स्पेसल)
- Chart preparation time: prev day at 18:36
- Type: TOD (TRAIN ON DEMAND) covering 1646 kms in 30 hours 50 mins
- Frequency: Runs 1 days Wed
- Route: Puratchi Thalaivar DR MGR CTL (MAS) to Shalimar (SHM).
- Major Stops: BZA (Vijayawada JN), SCMN (Simhachalam North), VZM (Vizianagram JN), KUR (Khurda Road JN), BBS (Bhubaneswar), CTC (Cuttack), KGP (Kharagpur JN)
- Coaches: 2 Second AC, 7 Third AC, 7 Sleeper Class
02842 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| MAS | 1 | 04:30 | 04:30 | 0 | 0 | Puratchi Thalaivar DR MGR CTL |
| GDR | 1 | 07:00 | 07:02 | 2 | 137 | Gudur JN |
| NLR | 1 | 07:20 | 07:22 | 2 | 176 | Nellore |
| OGL | 1 | 09:05 | 09:07 | 2 | 292 | Ongole |
| BZA | 1 | 13:05 | 13:15 | 10 | 430 | Vijayawada JN |
| RJY | 1 | 16:48 | 16:50 | 2 | 579 | Rajamundry |
| DVD | 1 | 19:30 | 19:32 | 2 | 762 | Duvvada |
| SCMN | 1 | 20:05 | 20:10 | 5 | 776 | Simhachalam North |
| VZM | 1 | 20:50 | 20:55 | 5 | 827 | Vizianagram JN |
| BAM | 2 | 00:10 | 00:12 | 2 | 1044 | Brahmapur |
| KUR | 2 | 02:25 | 02:35 | 10 | 1190 | Khurda Road JN |
| BBS | 2 | 02:55 | 03:00 | 5 | 1209 | Bhubaneswar |
| CTC | 2 | 03:30 | 03:35 | 5 | 1236 | Cuttack |
| BHC | 2 | 06:23 | 06:25 | 2 | 1352 | Bhadrakh |
| BLS | 2 | 07:05 | 07:07 | 2 | 1411 | Balasore |
| KGP | 2 | 08:50 | 08:55 | 5 | 1532 | Kharagpur JN |
| SRC | 2 | 10:40 | 10:42 | 2 | 1641 | Santragachi JN |
| SHM | 2 | 11:20 | 11:20 | 0 | 1646 | Shalimar |
02842 chart preparation time
02842 chart preparation time was 18:36 (06:36 PM) last night, as it is prepared a day before for the train starting today from Puratchi Thalaivar DR MGR CTL at 04:30.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: