01922 train VGLJ-PUNE WEEKLY SPL
01922 starts from VGLJ (Virangana Lakshmibai Jhansi JN) at 12:50 and reaches PUNE (Pune JN) at 11:35 covering a distance of 1178 kms and 14 stations. 01922 is scheduled to run on Wed at 12:50 from VGLJ Virangana Lakshmibai Jhansi JN station to reach PUNE Pune JN at 11:35.
- Train Number: 01922 Name: VGLJ-PUNE WEEKLY SPL (झान्सी पुणे स्पस्ल)
- Type: TOD (TRAIN ON DEMAND) covering 1178 kms in 22 hours 45 mins
- Frequency: Runs 1 days Wed
- Route: Virangana Lakshmibai Jhansi JN (VGLJ) to Pune JN (PUNE).
- Major Stops: RKMP (Rani Kamalapati), ET (Itarsi JN), BSL (Bhusaval JN), MMR (Manmad JN)
- Coaches: Coach details will be available once the train schedule is finalized.
01922 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| VGLJ | 1 | 12:50 | 12:50 | 0 | 0 | Virangana Lakshmibai Jhansi JN |
| LAR | 1 | 13:53 | 13:55 | 2 | 89 | Lalitpur |
| BINA | 1 | 15:18 | 15:20 | 2 | 151 | Bina JN |
| BHS | 1 | 16:20 | 16:22 | 2 | 236 | Vidisha |
| RKMP | 1 | 17:15 | 17:25 | 10 | 296 | Rani Kamalapati |
| NDPM | 1 | 18:43 | 18:45 | 2 | 364 | Narmadapuram |
| ET | 1 | 19:15 | 19:20 | 5 | 381 | Itarsi JN |
| KNW | 1 | 22:21 | 22:23 | 2 | 559 | Khandwa Junction |
| BSL | 2 | 00:10 | 00:15 | 5 | 682 | Bhusaval JN |
| MMR | 2 | 03:55 | 04:00 | 5 | 866 | Manmad JN |
| KPG | 2 | 04:58 | 05:00 | 2 | 908 | Kopargaon |
| ANG | 2 | 06:52 | 06:55 | 3 | 1019 | Ahilyanagar |
| DDCC | 2 | 10:03 | 10:05 | 2 | 1106 | Daund Chord Line |
| PUNE | 2 | 11:35 | 11:35 | 0 | 1178 | Pune JN |
01922 chart preparation time
The first reservation chart for 01922 is usually prepared by 08:00 PM on the previous evening. For its scheduled departure at 12:50 from Virangana Lakshmibai Jhansi JN, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: