20820 train OKHA PURI EXP

20820 starts from OKHA (Okha) at 19:05 and reaches PURI (Puri) at 18:30 covering a distance of 2777 kms and 41 stations. 20820 is scheduled to run on Wed at 19:05 from OKHA Okha station to reach PURI Puri at 18:30.

20820 train route, schedule and stations time table

CodeDayArrivalDepartsHaltKMsStation
OKHA119:0519:0500Okha
DWK119:3619:41529Dwarka
KMBL120:4220:442113Khambhaliya
JAM121:3321:385167Jamnagar
HAPA121:5221:542176Hapa
RJT123:4023:455249Rajkot
SUNR201:2701:292365Surendranagar
VG202:4002:422430Viramgam JN
ADI203:5504:005495Ahmedabad JN
BRC205:5806:035593Vadodara JN
ST207:5107:565723Surat
NDB210:1010:2010883Nandurbar
DDE211:1411:162917Dondaicha
AN212:0212:053978Amalner
JL213:2213:2531034Jalgaon JN
BSL213:5013:5551058Bhusaval JN
MKU214:4014:4221108Malkapur
SEG215:2815:3021161Shegaon
AK216:0016:0551198Akola JN
BD217:2217:2531277Badnera JN
WR218:3218:3531372Wardha JN
CD220:2020:2221491Chandrapur
BPQ221:0521:1051505Balharshah
SKZR222:0422:0511575Sirpur Kaghaznagar
MCI222:4422:4511633Mancheral
RDM222:5923:0011647Ramgundam
WL300:0800:1021750Warangal
BZA303:5004:05151960Vijayawada JN
EE304:4804:5022019Eluru
RJY306:0806:1022109Rajamundry
SLO306:4806:5022159Samalkot JN
AKP308:1308:1522277Anakapalle
VSKP310:0510:25202310Visakhapatnam
VZM311:1011:1552371Vizianagram JN
CHE312:0312:0522440Srikakulam Road
PSA313:1813:2022513Palasa
BAM314:2014:2552587Brahmapur
CAP314:4014:4222608Chatrapur
BALU315:2215:2422663Balugan
KUR316:3016:50202734Khurda Road JN
PURI318:3018:3002778Puri

20820 chart preparation time

The first reservation chart for 20820 is usually prepared at least 10 hours before departure. For its scheduled departure at 19:05 from Okha, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.

Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.

The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.

Train data refreshed on: