09050 train BSL-DDR SPL
09050 starts from BSL (Bhusaval JN) at 17:40 and reaches DDR (Dadar) at 05:15 covering a distance of 581 kms and 20 stations. 09050 is scheduled to run on Fri at 17:40 from BSL Bhusaval JN station to reach DDR Dadar at 05:15.
- Train Number: 09050 Name: BSL-DDR SPL (भुसावल दादर स्पेशल)
- Type: TOD (TRAIN ON DEMAND) covering 581 kms in 11 hours 35 mins
- Frequency: Runs 1 days Fri
- Route: Bhusaval JN (BSL) to Dadar (DDR).
- Major Stops: NDB (Nandurbar), BHET (Bhestan)
- Coaches: 4 Second Sitting, 9 Sleeper Class, 3 Third AC, 2 2nd & 3rd AC, 1 1st & 2nd AC
09050 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| BSL | 1 | 17:40 | 17:40 | 0 | 0 | Bhusaval JN |
| JL | 1 | 18:05 | 18:08 | 3 | 24 | Jalgaon JN |
| DXG | 1 | 18:47 | 18:49 | 2 | 55 | Dharangaon |
| AN | 1 | 19:18 | 19:20 | 2 | 80 | Amalner |
| NDN | 1 | 19:34 | 19:36 | 2 | 108 | Nardana |
| SNK | 1 | 19:51 | 19:53 | 2 | 121 | Sindkheda |
| DDE | 1 | 20:08 | 20:10 | 2 | 140 | Dondaicha |
| NDB | 1 | 20:45 | 20:55 | 10 | 175 | Nandurbar |
| NWU | 1 | 21:35 | 21:37 | 2 | 232 | Navapur |
| VYA | 1 | 22:11 | 22:13 | 2 | 274 | Vyara |
| BIY | 1 | 22:35 | 22:37 | 2 | 304 | Bardoli |
| CHM | 1 | 22:53 | 22:55 | 2 | 320 | Chalthan |
| BHET | 1 | 23:40 | 23:45 | 5 | 334 | Bhestan |
| NVS | 2 | 00:30 | 00:32 | 2 | 354 | Navsari |
| BL | 2 | 01:13 | 01:15 | 2 | 394 | Valsad |
| VAPI | 2 | 01:37 | 01:39 | 2 | 420 | Vapi |
| PLG | 2 | 03:17 | 03:19 | 2 | 501 | Palghar |
| VR | 2 | 03:55 | 03:57 | 2 | 532 | Virar |
| BVI | 2 | 04:22 | 04:24 | 2 | 558 | Borivali |
| DDR | 2 | 05:15 | 05:15 | 0 | 582 | Dadar |
09050 chart preparation time
The first reservation chart for 09050 is usually prepared at least 10 hours before departure. For its scheduled departure at 17:40 from Bhusaval JN, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.