07056 train AKP SC SPL
07056 starts from AKP (Anakapalle) at 17:35 and reaches SC (Secunderabad JN) at 08:30 covering a distance of 630 kms and 18 stations. 07056 is scheduled to run on Fri at 17:35 from AKP Anakapalle station to reach SC Secunderabad JN at 08:30.
- Train Number: 07056 Name: AKP SC SPL (अनकपल्लि सिकिन्देरबद्)
- Type: TOD (TRAIN ON DEMAND) covering 630 kms in 14 hours 55 mins
- Frequency: Runs 1 days Fri
- Route: Anakapalle (AKP) to Secunderabad JN (SC).
- Major Stops: RJY (Rajamundry), BZA (Vijayawada JN), GNT (Guntur JN)
- Coaches: 2 Second Sitting, 8 Sleeper Class, 8 Third AC, 1 Second AC, 1 First AC, 2 2nd & 3rd AC
07056 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| AKP | 1 | 17:35 | 17:35 | 0 | 0 | Anakapalle |
| YLM | 1 | 17:53 | 17:55 | 2 | 24 | Elamanchili |
| TUNI | 1 | 18:18 | 18:20 | 2 | 64 | Tuni |
| ANV | 1 | 18:48 | 18:50 | 2 | 80 | Annavaram |
| SLO | 1 | 19:33 | 19:35 | 2 | 117 | Samalkot JN |
| RJY | 1 | 20:20 | 20:30 | 10 | 168 | Rajamundry |
| NDD | 1 | 20:58 | 21:00 | 2 | 190 | Nidadavolu JN |
| TDD | 1 | 21:18 | 21:20 | 2 | 210 | Tadepalligudem |
| EE | 1 | 21:58 | 22:00 | 2 | 257 | Eluru |
| BZA | 1 | 22:50 | 23:00 | 10 | 317 | Vijayawada JN |
| GNT | 1 | 23:50 | 23:55 | 5 | 350 | Guntur JN |
| SAP | 2 | 00:48 | 00:50 | 2 | 392 | Sattenapalle |
| PGRL | 2 | 01:23 | 01:25 | 2 | 424 | Piduguralla |
| NDKD | 2 | 01:58 | 02:00 | 2 | 445 | Nadikode |
| MRGA | 2 | 02:58 | 03:00 | 2 | 483 | Miryalaguda |
| NLDA | 2 | 03:48 | 03:50 | 2 | 521 | Nalgonda |
| CHZ | 2 | 06:18 | 06:20 | 2 | 619 | Charlapalli |
| SC | 2 | 08:30 | 08:30 | 0 | 630 | Secunderabad JN |
07056 chart preparation time
The first reservation chart for 07056 is usually prepared at least 10 hours before departure. For its scheduled departure at 17:35 from Anakapalle, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.