07028 train BAM CHZ SPL
07028 starts from BAM (Brahmapur) at 11:30 and reaches CHZ (Charlapalli) at 07:30 covering a distance of 915 kms and 24 stations. 07028 is scheduled to run on Sat at 11:30 from BAM Brahmapur station to reach CHZ Charlapalli at 07:30.
- Train Number: 07028 Name: BAM CHZ SPL (बेरहम्पुर् चेर्लपल्लि)
- Chart preparation time: prev day at 19:51
- Type: TOD (TRAIN ON DEMAND) covering 915 kms in 20 hours 00 mins
- Frequency: Runs 1 days Sat
- Route: Brahmapur (BAM) to Charlapalli (CHZ).
- Major Stops: VZM (Vizianagram JN), BZA (Vijayawada JN), GNT (Guntur JN)
- Coaches: 13 Sleeper Class, 2 Second AC, 4 Third AC
07028 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| BAM | 1 | 11:30 | 11:30 | 0 | 0 | Brahmapur |
| IPM | 1 | 11:52 | 11:54 | 2 | 24 | Ichchpuram |
| SPT | 1 | 12:03 | 12:05 | 2 | 42 | Sompeta |
| PSA | 1 | 12:53 | 12:55 | 2 | 74 | Palasa |
| NWP | 1 | 13:13 | 13:15 | 2 | 99 | Naupada JN |
| CHE | 1 | 13:48 | 13:50 | 2 | 147 | Srikakulam Road |
| CPP | 1 | 14:10 | 14:12 | 2 | 185 | Chipurupalle |
| VZM | 1 | 14:40 | 14:50 | 10 | 216 | Vizianagram JN |
| KTV | 1 | 15:15 | 15:17 | 2 | 251 | Kottavalasa |
| PDT | 1 | 15:25 | 15:27 | 2 | 260 | Pendurti |
| DVD | 1 | 16:45 | 16:47 | 2 | 281 | Duvvada |
| AKP | 1 | 17:00 | 17:02 | 2 | 297 | Anakapalle |
| YLM | 1 | 17:20 | 17:22 | 2 | 320 | Elamanchili |
| ANV | 1 | 18:20 | 18:22 | 2 | 377 | Annavaram |
| SLO | 1 | 18:45 | 18:47 | 2 | 414 | Samalkot JN |
| RJY | 1 | 19:25 | 19:27 | 2 | 464 | Rajamundry |
| TDD | 1 | 20:05 | 20:07 | 2 | 506 | Tadepalligudem |
| EE | 1 | 20:45 | 20:47 | 2 | 554 | Eluru |
| BZA | 1 | 22:20 | 22:30 | 10 | 614 | Vijayawada JN |
| GNT | 2 | 01:00 | 01:05 | 5 | 646 | Guntur JN |
| SAP | 2 | 01:58 | 02:00 | 2 | 689 | Sattenapalle |
| MRGA | 2 | 03:28 | 03:30 | 2 | 780 | Miryalaguda |
| NLDA | 2 | 04:18 | 04:20 | 2 | 818 | Nalgonda |
| CHZ | 2 | 07:30 | 07:30 | 0 | 915 | Charlapalli |
07028 chart preparation time
07028 chart preparation time was 19:51 (07:51 PM) last night, as it is prepared a day before for the train starting today from Brahmapur at 11:30.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.