04125 train SFG BDTS SF SPL
04125 starts from SFG (Subedarganj) at 05:20 and reaches BDTS (Bandra Terminus) at 09:30 covering a distance of 1679 kms and 19 stations. 04125 is scheduled to run on Mon at 05:20 from SFG Subedarganj station to reach BDTS Bandra Terminus at 09:30.
- Train Number: 04125 Name: SFG BDTS SF SPL (सुबेदारगन्ज बाद्रा स्पेसल)
- Type: TOD (TRAIN ON DEMAND) covering 1679 kms in 28 hours 10 mins
- Frequency: Runs 1 days Mon
- Route: Subedarganj (SFG) to Bandra Terminus (BDTS).
- Major Stops: GOY (Govindpuri), TDL (Tundla JN), IDH (Idgah JN), KOTA (Kota JN), RTM (Ratlam JN), BRC (Vadodara JN), ST (Surat)
- Coaches: 6 Sleeper Class, 6 Third AC, 4 AC 3 Economy
04125 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| SFG | 1 | 05:20 | 05:20 | 0 | 0 | Subedarganj |
| FTP | 1 | 06:35 | 06:37 | 2 | 113 | Fatehpur |
| GOY | 1 | 07:50 | 07:55 | 5 | 194 | Govindpuri |
| ETW | 1 | 09:43 | 09:45 | 2 | 329 | Etawah JN |
| TDL | 1 | 11:30 | 11:35 | 5 | 421 | Tundla JN |
| IDH | 1 | 12:15 | 12:20 | 5 | 445 | Idgah JN |
| FTS | 1 | 12:58 | 13:00 | 2 | 479 | Fatehpur Sikri |
| RBS | 1 | 13:14 | 13:16 | 2 | 494 | Rupbas |
| BXN | 1 | 14:43 | 14:45 | 2 | 528 | Bayana JN |
| GGC | 1 | 15:43 | 15:45 | 2 | 605 | Gangapur City |
| SWM | 1 | 16:28 | 16:30 | 2 | 668 | Sawai Madhopur JN |
| KOTA | 1 | 17:40 | 17:45 | 5 | 776 | Kota JN |
| RTM | 1 | 22:25 | 22:35 | 10 | 1041 | Ratlam JN |
| BRC | 2 | 03:15 | 03:25 | 10 | 1299 | Vadodara JN |
| ST | 2 | 05:15 | 05:20 | 5 | 1428 | Surat |
| BL | 2 | 06:23 | 06:25 | 2 | 1497 | Valsad |
| VAPI | 2 | 06:56 | 06:58 | 2 | 1523 | Vapi |
| BVI | 2 | 08:39 | 08:42 | 3 | 1661 | Borivali |
| BDTS | 2 | 09:30 | 09:30 | 0 | 1680 | Bandra Terminus |
04125 chart preparation time
The first reservation chart for 04125 is usually prepared by 08:00 PM on the previous evening. For its scheduled departure at 05:20 from Subedarganj, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.