03249 train RGD PNBE SPL
03249 starts from RGD (Rajgir) at 15:10 and reaches PNBE (Patna JN) at 18:20 covering a distance of 96 kms and 13 stations. 03249 is scheduled to run on Sun, Mon, Tue, Wed, Thu, Fri, Sat at 15:10 from RGD Rajgir station to reach PNBE Patna JN at 18:20.
- Train Number: 03249 Name: RGD PNBE SPL (राजगीर पटना एक्सप्रेस स्पेशल)
- Chart preparation time: same day at 07:10
- Type: TOD (TRAIN ON DEMAND) covering 96 kms in 03 hours 10 mins
- Frequency: Runs 7 days Sun Mon Tue Wed Thu Fri Sat
- Route: Rajgir (RGD) to Patna JN (PNBE).
- Major Stops: NLD (Nalanda), BEHS (Bihar Sharif), WENA (Wena), HRT (Harnaut), BKP (Bakhtiyarpur JN), KWO (Karauta), KOO (Khusropur), FUT (Fatuha), PNC (Patna Saheb), GZH (Gulzarbagh), RJPB (Rajendra Nagar)
- Coaches: 7 Sleeper Class, 4 Third AC, 2 Second AC
03249 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| RGD | 1 | 15:10 | 15:10 | 0 | 0 | Rajgir |
| NLD | 1 | 15:30 | 15:32 | 2 | 11 | Nalanda |
| BEHS | 1 | 15:45 | 15:47 | 2 | 21 | Bihar Sharif |
| WENA | 1 | 15:58 | 16:00 | 2 | 35 | Wena |
| HRT | 1 | 16:05 | 16:07 | 2 | 40 | Harnaut |
| BKP | 1 | 16:35 | 16:37 | 2 | 51 | Bakhtiyarpur JN |
| KWO | 1 | 16:46 | 16:48 | 2 | 60 | Karauta |
| KOO | 1 | 16:55 | 16:57 | 2 | 66 | Khusropur |
| FUT | 1 | 17:11 | 17:13 | 2 | 74 | Fatuha |
| PNC | 1 | 17:23 | 17:25 | 2 | 86 | Patna Saheb |
| GZH | 1 | 17:31 | 17:33 | 2 | 89 | Gulzarbagh |
| RJPB | 1 | 17:40 | 17:42 | 2 | 94 | Rajendra Nagar |
| PNBE | 1 | 18:20 | 18:20 | 0 | 96 | Patna JN |
03249 chart preparation time
03249 chart preparation time today is 07:10 (07:10 AM) for the train starting from Rajgir at 15:10.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.