02134 train JBP BDTS SF SPL
02134 starts from JBP (Jabalpur) at 17:00 and reaches BDTS (Bandra Terminus) at 14:10 covering a distance of 1257 kms and 14 stations. 02134 is scheduled to run on Fri at 17:00 from JBP Jabalpur station to reach BDTS Bandra Terminus at 14:10.
- Train Number: 02134 Name: JBP BDTS SF SPL (स्पेशल)
- Type: TOD (TRAIN ON DEMAND) covering 1257 kms in 21 hours 10 mins
- Frequency: Runs 1 days Fri
- Route: Jabalpur (JBP) to Bandra Terminus (BDTS).
- Major Stops: ET (Itarsi JN), BPL (Bhopal JN), SHRN (Sant Hirdaram Nagar), UJN (Ujjain JN), RTM (Ratlam JN), BRC (Vadodara JN), ST (Surat)
- Coaches: 6 Third AC, 2 Second AC, 1 First AC, 9 Sleeper Class, 1 Sitting & Luggage
- Engine reversal stations (coaches direction): ET (Itarsi JN)
02134 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| JBP | 1 | 17:00 | 17:00 | 0 | 0 | Jabalpur |
| NU | 1 | 18:03 | 18:05 | 2 | 84 | Narsinghpur |
| PPI | 1 | 19:04 | 19:06 | 2 | 178 | Pipariya |
| ET | 1 | 20:30 | 20:45 | 15 | 245 | Itarsi JN |
| NDPM | 1 | 21:05 | 21:07 | 2 | 263 | Narmadapuram |
| BPL | 1 | 22:25 | 22:35 | 10 | 337 | Bhopal JN |
| SHRN | 1 | 23:00 | 23:05 | 5 | 350 | Sant Hirdaram Nagar |
| UJN | 2 | 01:40 | 01:45 | 5 | 523 | Ujjain JN |
| RTM | 2 | 03:50 | 03:55 | 5 | 619 | Ratlam JN |
| BRC | 2 | 08:00 | 08:10 | 10 | 877 | Vadodara JN |
| ST | 2 | 10:17 | 10:22 | 5 | 1006 | Surat |
| VAPI | 2 | 11:34 | 11:36 | 2 | 1101 | Vapi |
| BVI | 2 | 13:07 | 13:10 | 3 | 1239 | Borivali |
| BDTS | 2 | 14:10 | 14:10 | 0 | 1258 | Bandra Terminus |
02134 chart preparation time
The first reservation chart for 02134 is usually prepared at least 10 hours before departure. For its scheduled departure at 17:00 from Jabalpur, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.