12950 train KAVIGURU EXP
12950 starts from SRC (Santragachi JN) at 19:50 and reaches PBR (Porbandar) at 17:40 covering a distance of 2664 kms and 37 stations. 12950 is scheduled to run on Sun at 19:50 from SRC Santragachi JN station to reach PBR Porbandar at 17:40.
- Train Number: 12950 Name: KAVIGURU EXP (सन्त्रागाची पोरबन्दर सु फा एक्सप्रेस)
- Chart preparation time: same day at 09:20
- Type: SUF (SUPERFAST) covering 2664 kms in 45 hours 50 mins
- Frequency: Runs 1 days Sun
- Route: Santragachi JN (SRC) to Porbandar (PBR).
- Major Stops: BSP (Bilaspur JN), NDB (Nandurbar), ADI (Ahmedabad JN), RJT (Rajkot), JLR (Jetalsar JN)
- Coaches: 2 Luggage & Divyang, 9 Sleeper Class, 6 Third AC, 2 Second AC, 1 First AC
12950 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| SRC | 1 | 19:50 | 19:50 | 0 | 0 | Santragachi JN |
| KGP | 1 | 21:22 | 21:27 | 5 | 109 | Kharagpur JN |
| MDN | 1 | 22:01 | 22:03 | 2 | 121 | Midnapore |
| VSU | 1 | 22:51 | 22:53 | 2 | 193 | Bishnupur |
| BQA | 1 | 23:20 | 23:22 | 2 | 224 | Bankura |
| ADRA | 2 | 00:05 | 00:10 | 5 | 277 | Adra |
| PRR | 2 | 00:55 | 01:00 | 5 | 316 | Purulia JN |
| CKP | 2 | 02:55 | 02:57 | 2 | 435 | Chakaradharpur |
| ROU | 2 | 04:20 | 04:28 | 8 | 536 | Rourkela |
| JSG | 2 | 06:13 | 06:15 | 2 | 638 | Jharsuguda JN |
| CPH | 2 | 08:11 | 08:13 | 2 | 790 | Champa |
| BSP | 2 | 09:15 | 09:30 | 15 | 843 | Bilaspur JN |
| R | 2 | 11:00 | 11:05 | 5 | 958 | Raipur JN |
| DURG | 2 | 12:05 | 12:10 | 5 | 996 | Durg |
| G | 2 | 13:58 | 14:00 | 2 | 1131 | Gondia JN |
| NGP | 2 | 16:20 | 16:25 | 5 | 1261 | Nagpur JN |
| WR | 2 | 17:23 | 17:25 | 2 | 1340 | Wardha JN |
| BD | 2 | 19:13 | 19:15 | 2 | 1435 | Badnera JN |
| AK | 2 | 20:12 | 20:15 | 3 | 1514 | Akola JN |
| MKU | 2 | 21:18 | 21:20 | 2 | 1604 | Malkapur |
| BSL | 2 | 22:25 | 22:30 | 5 | 1654 | Bhusaval JN |
| JL | 2 | 23:04 | 23:07 | 3 | 1679 | Jalgaon JN |
| NDB | 3 | 01:15 | 01:25 | 10 | 1829 | Nandurbar |
| ST | 3 | 03:53 | 03:58 | 5 | 1989 | Surat |
| BH | 3 | 04:57 | 04:59 | 2 | 2048 | Bharuch JN |
| BRC | 3 | 06:00 | 06:05 | 5 | 2119 | Vadodara JN |
| ANND | 3 | 06:40 | 06:42 | 2 | 2153 | Anand JN |
| ADI | 3 | 08:30 | 08:40 | 10 | 2217 | Ahmedabad JN |
| VG | 3 | 09:48 | 09:50 | 2 | 2282 | Viramgam JN |
| SUNR | 3 | 11:01 | 11:03 | 2 | 2347 | Surendranagar |
| RJT | 3 | 12:50 | 13:00 | 10 | 2463 | Rajkot |
| BKNG | 3 | 13:20 | 13:22 | 2 | 2469 | Bhakti Nagar |
| GDL | 3 | 14:08 | 14:09 | 1 | 2504 | Gondal |
| JLR | 3 | 14:30 | 14:40 | 10 | 2540 | Jetalsar JN |
| UA | 3 | 15:11 | 15:12 | 1 | 2572 | Upleta |
| JDH | 3 | 15:53 | 15:54 | 1 | 2607 | JAM Jodhpur JN |
| PBR | 3 | 17:40 | 17:40 | 0 | 2664 | Porbandar |
12950 chart preparation time
12950 chart preparation time today is 09:20 (09:20 AM) for the train starting from Santragachi JN at 19:50.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: