12861 train route, schedule and time table

The 12861 Vskp Mbnr Sf is a popular daily Superfast train connecting Visakhapatnam (VISAKHAPATNAM) to Mahbubnagar (MAHBUBNAGAR). This article provides all the details about the 12861 train, including its route, schedule, stops, and coach composition information. It also provides today and tomorrow's station stop details and halt timings.

Essential information of 12861

12861 Train Schedule

12861 starts from Visakhapatnam VSKP (VISAKHAPATNAM) at 18:40 and reaches Mahbubnagar MBNR (MAHBUBNAGAR) at 09:20 covering a distance of 808 kms and 23 stations. 12861 is scheduled to run on Mon, Tue, Wed, Thu, Fri, Sat, Sun at 18:40 from VSKP VISAKHAPATNAM station. Train coach composition is of FIRST AC (1A), SECOND AC (2A), THIRD AC (3A), SLEEPER CLASS (SL) classes.

Rake composition: SLR GS GS GS GS S6 S5 S4 S3 S2 S1 B7 B6 B5 B4 B3 B2 B1 A2 A1 H1 EOG L

Coach position: SLRD GEN GEN GEN GEN S6:SL S5:SL S4:SL S3:SL S2:SL S1:SL B7:3A B6:3A B5:3A B4:3A B3:3A B2:3A B1:3A A2:2A A1:2A H1:1A LPR:

12861 train route and stations time table

CodeArrivesDepartsHaltDistanceDayStation
VSKP18:4018:40--0 km1VISAKHAPATNAM
DVD19:0519:0702:0018 km1DUVVADA
AKP19:2319:2502:0034 km1ANAKAPALLE
TUNI20:0320:0502:0097 km1TUNI
ANV20:1820:2002:00114 km1ANNAVARAM
SLO20:4820:5002:00151 km1SAMALKOT JN
RJY21:3321:3502:00201 km1RAJAHMUNDRY
NDD22:0322:0502:00223 km1NIDADAVOLU JN
TDD22:1822:2002:00243 km1TADEPALLIGUDEM
EE22:5322:5502:00291 km1ELURU
RYP00:0500:1005:00358 km2RAYANAPADU
MDR01:1401:1501:00403 km2MADHIRA
KMT01:4301:4502:00447 km2KHAMMAM
DKJ02:0302:0502:00470 km2DORNAKAL JN
MABD02:2302:2502:00494 km2MAHBUBABAD
WL03:1803:2002:00555 km2WARANGAL
KZJ03:3303:3502:00565 km2KAZIPET JN
MJF06:1806:2002:00694 km2MALKAJGIRI
KCG06:4506:5510:00703 km2KACHEGUDA
UR07:2907:3001:00723 km2UMDANAGAR
SHNR07:4907:5001:00755 km2SHADNAGAR
JCL08:1908:2001:00791 km2JADCHERLA
MBNR09:20----808 km2MAHBUBNAGAR

Train info updated on 2025-01-30