09049 train DDR-BSL SPL
09049 starts from DDR (Dadar) at 00:15 and reaches BSL (Bhusaval JN) at 12:25 covering a distance of 581 kms and 20 stations. 09049 is scheduled to run on Fri at 00:15 from DDR Dadar station to reach BSL Bhusaval JN at 12:25.
- Train Number: 09049 Name: DDR-BSL SPL (दादर भुसावल स्पेशल)
- Chart preparation time: prev day at 15:59
- Type: TOD (TRAIN ON DEMAND) covering 581 kms in 12 hours 10 mins
- Frequency: Runs 1 days Fri
- Route: Dadar (DDR) to Bhusaval JN (BSL).
- Major Stops: BVI (Borivali), BHET (Bhestan), NDB (Nandurbar)
- Coaches: 4 Second Sitting, 1 1st & 2nd AC, 2 2nd & 3rd AC, 3 Third AC, 9 Sleeper Class
09049 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| DDR | 1 | 00:15 | 00:15 | 0 | 0 | Dadar |
| BVI | 1 | 00:38 | 00:43 | 5 | 24 | Borivali |
| VR | 1 | 01:12 | 01:14 | 2 | 50 | Virar |
| PLG | 1 | 01:36 | 01:38 | 2 | 81 | Palghar |
| VAPI | 1 | 02:41 | 02:43 | 2 | 162 | Vapi |
| BL | 1 | 03:06 | 03:08 | 2 | 188 | Valsad |
| NVS | 1 | 03:58 | 04:00 | 2 | 227 | Navsari |
| BHET | 1 | 04:30 | 04:35 | 5 | 247 | Bhestan |
| CHM | 1 | 05:30 | 05:32 | 2 | 262 | Chalthan |
| BIY | 1 | 05:47 | 05:49 | 2 | 277 | Bardoli |
| VYA | 1 | 06:27 | 06:29 | 2 | 308 | Vyara |
| NWU | 1 | 07:13 | 07:15 | 2 | 349 | Navapur |
| NDB | 1 | 08:25 | 08:30 | 5 | 407 | Nandurbar |
| DDE | 1 | 09:03 | 09:05 | 2 | 441 | Dondaicha |
| SNK | 1 | 09:23 | 09:25 | 2 | 461 | Sindkheda |
| NDN | 1 | 09:38 | 09:40 | 2 | 474 | Nardana |
| AN | 1 | 10:22 | 10:24 | 2 | 502 | Amalner |
| DXG | 1 | 10:46 | 10:48 | 2 | 527 | Dharangaon |
| JL | 1 | 11:40 | 11:43 | 3 | 558 | Jalgaon JN |
| BSL | 1 | 12:25 | 12:25 | 0 | 582 | Bhusaval JN |
09049 chart preparation time
09049 chart preparation time was 15:59 (03:59 PM) last night, as it is prepared a day before for the train starting today from Dadar at 00:15.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: