Train 09017 coach position
- 09017 train
- 09017 coach position
Check train sequence, 09017 coach position from engine, and rake composition, and know your Laying / Sitting Position through seat layout map.
09017 coach position
Coach Positon | Coach Class |
---|---|
0. Eng | Engine |
1. GEN | General Compartment |
2. UR | UnReserved Second Class |
3. A1 | 2A SECOND AC |
4. B1 | 3A THIRD AC |
5. B2 | 3A THIRD AC |
6. B3 | 3A THIRD AC |
7. BE1 | 3A THIRD AC |
8. BE 2 | 3A THIRD AC |
9. SE1 | SL SLEEPER CLASS |
10. SE2 | SL SLEEPER CLASS |
11. S1 | SL SLEEPER CLASS |
12. S2 | SL SLEEPER CLASS |
13. S3 | SL SLEEPER CLASS |
14. S4 | SL SLEEPER CLASS |
15. S5 | SL SLEEPER CLASS |
16. S6 | SL SLEEPER CLASS |
17. S7 | SL SLEEPER CLASS |
18. S8 | SL SLEEPER CLASS |
19. S9 | SL SLEEPER CLASS |
20. S10 | SL SLEEPER CLASS |
21. S11 | SL SLEEPER CLASS |
22. S12 | SL SLEEPER CLASS |
23. GEN | General Compartment |
24. SLRD | Luggage Rake + Divyang |
25. SLRD | Luggage Rake + Divyang |
Live 09017 coach position :
- 0 Eng
- 1 GEN
- 2 UR
- 3 2AA1
- 4 3AB1
- 5 3AB2
- 6 3AB3
- 7 3ABE1
- 8 3ABE 2
- 9 SLSE1
- 10 SLSE2
- 11 SLS1
- 12 SLS2
- 13 SLS3
- 14 SLS4
- 15 SLS5
- 16 SLS6
- 17 SLS7
- 18 SLS8
- 19 SLS9
- 20 SLS10
- 21 SLS11
- 22 SLS12
- 23 GEN
- 24 SLRD
- 25 SLRD
09017 train coach position earlier was Eng GEN UR A1 B1 B2 B3 SE 1 S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 GEN SLRD SLRD
Vapi Gaya Spl coach order finalization time: 20:54
09017 seat position map
Rail 09017 coach seating arrangement of classes SECOND AC (2A), THIRD AC (3A), SLEEPER CLASS (SL) is:
09017 coach position at station
Coach sequence remains same as there are no engine reversal stations.
station | coach position |
---|---|
VAPI (VAPI) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
VALSAD (BL) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
NAVSARI (NVS) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
BHESTAN (BHET) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
NANDURBAR (NDB) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
BHUSAVAL JN (BSL) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
KHANDWA (KNW) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
ITARSI JN (ET) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
JABALPUR (JBP) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
KATNI (KTE) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
MAIHAR (MYR) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
SATNA (STA) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
MANIKPUR (MKP) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
PRAYAGRAJCHEOKI (PCOI) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
MIRZAPUR (MZP) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
CHUNAR (CAR) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
DD UPADHYAYA JN (DDU) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
BHABUA ROAD (BBU) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
SASARAM (SSM) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
DEHRI ON SONE (DOS) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
ANUGRAHA N ROAD (AUBR) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
GAYA JN (GAYA) | Eng GEN UR A1:2A B1:3A B2:3A B3:3A BE1:3A BE 2:3A SE1:SL SE2:SL S1:SL S2:SL S3:SL S4:SL S5:SL S6:SL S7:SL S8:SL S9:SL S10:SL S11:SL S12:SL GEN SLRD SLRD |
Coaches data updated on 2025-01-24
Coach composition overview:
1. Engine (E): The frontmost coach, housing the locomotive (Loco) brake engine.
2. General (GS): Usually near the engine, this coach is for general seating without specific seat reservations.
3. AC First Class (1A): Positioned closer to the engine, offering premium amenities and spacious cabins.
4. AC Two Tier (2A): Typically located after AC First Class, featuring comfortable berths in a two-tier arrangement.
5. AC Three Tier (3A): Following AC Two Tier, providing berths in a three-tier setup with air conditioning.
6. Sleeper Class (SL): Positioned after AC Three Tier, offering berths for overnight journeys at an affordable price.
7. Second Seating (2S): Found towards the rear, offering basic seating without berths, ideal for short-distance travel.
8. Unreserved (UR): Usually at the rear, offering seats on a first-come, first-served basis without reservations. Understanding these positions helps you navigate the train easily and locate your coach efficiently, enhancing your travel experience.
9. Pantry Car (PC): Positioned strategically in the middle or towards the rear, providing food and beverages during the journey.
10. Luggage (LU): Located near the rear, designated for storing passenger luggage safely throughout the trip.
11. Guard's Cabin (GS/GD): Found at the rear end, housing the train guard and control systems for operational purposes.
12. Ladies Coach (LDY): Designated coach exclusively for female passengers, ensuring a safe and comfortable travel environment.
13. Handicapped Coach (HA/HP): Specifically designed for passengers with disabilities, equipped with facilities for easy accessibility.
14. Divyaangjan Coach (DA/DP): Similar to the Handicapped Coach, catering specifically to passengers with special needs or differently-abled individuals.
15. Parcel (SLR): Located at the rear, reserved for transporting parcels and goods, separate from passenger compartments.