05672 train ROK-KYQ SPL
05672 starts from ROK (Rohtak JN) at 12:00 and reaches KYQ (Kamakhya) at 05:00 covering a distance of 1944 kms and 20 stations. 05672 is scheduled to run on Tue at 12:00 from ROK Rohtak JN station to reach KYQ Kamakhya at 05:00.
- Train Number: 05672 Name: ROK-KYQ SPL (स्पेसल)
- Type: TOD (TRAIN ON DEMAND) covering 1944 kms in 41 hours 00 mins
- Frequency: Runs 1 days Tue
- Route: Rohtak JN (ROK) to Kamakhya (KYQ).
- Major Stops: DLI (Delhi JN), BSB (Varanasi), CPR (Chhapra), BJU (Barauni JN), KIR (Katihar JN)
- Coaches: Coach details will be available once the train schedule is finalized.
05672 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| ROK | 1 | 12:00 | 12:00 | 0 | 0 | Rohtak JN |
| DLI | 1 | 13:50 | 14:00 | 10 | 70 | Delhi JN |
| GZB | 1 | 14:40 | 14:42 | 2 | 90 | Ghaziabad |
| GOY | 1 | 22:35 | 22:40 | 5 | 501 | Govindpuri |
| PRYJ | 2 | 01:20 | 01:25 | 5 | 699 | Prayagraj JN |
| BSB | 2 | 04:10 | 04:20 | 10 | 823 | Varanasi |
| GCT | 2 | 06:05 | 06:10 | 5 | 898 | Ghazipur City |
| BUI | 2 | 07:08 | 07:10 | 2 | 963 | Ballia |
| CPR | 2 | 08:50 | 09:00 | 10 | 1028 | Chhapra |
| HJP | 2 | 10:35 | 10:40 | 5 | 1088 | Hajipur JN |
| BCA | 2 | 12:28 | 12:30 | 2 | 1159 | Bachwara JN |
| BJU | 2 | 13:05 | 13:15 | 10 | 1175 | Barauni JN |
| BGS | 2 | 13:33 | 13:35 | 2 | 1191 | Begusarai |
| KGG | 2 | 14:08 | 14:10 | 2 | 1231 | Khagaria JN |
| MNE | 2 | 14:28 | 14:30 | 2 | 1240 | Mansi JN |
| KIR | 2 | 17:10 | 17:20 | 10 | 1355 | Katihar JN |
| NJP | 2 | 21:00 | 21:05 | 5 | 1540 | NEW Jalpaiguri |
| NCB | 2 | 23:13 | 23:15 | 2 | 1666 | NEW Cooch Behar |
| NBQ | 3 | 01:23 | 01:25 | 2 | 1794 | NEW Bongaigaon |
| KYQ | 3 | 05:00 | 05:00 | 0 | 1945 | Kamakhya |
05672 chart preparation time
The first reservation chart for 05672 is usually prepared by 08:00 PM on the previous evening. For its scheduled departure at 12:00 from Rohtak JN, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: