04060 train NDLS-SOU SPL
04060 starts from NDLS (NEW Delhi) at 21:35 and reaches SOU (Supaul) at 04:00 covering a distance of 1256 kms and 27 stations. 04060 is scheduled to run on Sun, Mon, Tue, Wed, Thu, Fri, Sat at 21:35 from NDLS NEW Delhi station to reach SOU Supaul at 04:00.
- Train Number: 04060 Name: NDLS-SOU SPL (स्पेसल्)
- Type: TOD (TRAIN ON DEMAND) covering 1256 kms in 30 hours 25 mins
- Frequency: Runs 7 days Sun Mon Tue Wed Thu Fri Sat
- Route: NEW Delhi (NDLS) to Supaul (SOU).
- Major Stops: ASH (Aishbagh), GKP (Gorakhpur JN), CPR (Chhapra), BJU (Barauni JN), SHC (Saharsa JN)
- Coaches: Coach details will be available once the train schedule is finalized.
04060 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| NDLS | 1 | 21:35 | 21:35 | 0 | 0 | NEW Delhi |
| GZB | 1 | 22:10 | 22:15 | 5 | 26 | Ghaziabad |
| ALJN | 2 | 00:38 | 00:40 | 2 | 132 | Aligarh JN |
| TDL | 2 | 03:20 | 03:22 | 2 | 210 | Tundla JN |
| ETW | 2 | 04:38 | 04:40 | 2 | 301 | Etawah JN |
| CNB | 2 | 07:50 | 07:55 | 5 | 441 | Kanpur Central |
| ON | 2 | 08:23 | 08:25 | 2 | 458 | Unnao JN |
| ASH | 2 | 09:40 | 09:50 | 10 | 517 | Aishbagh |
| BNZ | 2 | 10:08 | 10:10 | 2 | 526 | Badshahnagar |
| BBK | 2 | 10:53 | 10:55 | 2 | 550 | Barabanki JN |
| GD | 2 | 12:25 | 12:30 | 5 | 639 | Gonda JN |
| BST | 2 | 13:43 | 13:45 | 2 | 728 | Basti |
| KLD | 2 | 14:08 | 14:10 | 2 | 758 | Khalilabad |
| GKP | 2 | 15:30 | 15:40 | 10 | 793 | Gorakhpur JN |
| DEOS | 2 | 16:38 | 16:40 | 2 | 843 | Deoria Sadar |
| SV | 2 | 17:43 | 17:45 | 2 | 912 | Siwan JN |
| CPR | 2 | 19:15 | 19:25 | 10 | 973 | Chhapra |
| SEE | 2 | 20:50 | 20:52 | 2 | 1027 | Sonpur JN |
| HJP | 2 | 21:02 | 21:07 | 5 | 1032 | Hajipur JN |
| SPP | 2 | 22:00 | 22:02 | 2 | 1070 | Shahpur Patoree |
| BJU | 3 | 00:15 | 00:25 | 10 | 1120 | Barauni JN |
| BGS | 3 | 00:43 | 00:45 | 2 | 1135 | Begusarai |
| KGG | 3 | 01:28 | 01:30 | 2 | 1176 | Khagaria JN |
| MNE | 3 | 01:45 | 01:47 | 2 | 1184 | Mansi JN |
| SBV | 3 | 02:23 | 02:25 | 2 | 1212 | S Bhakhtiyarpur |
| SHC | 3 | 02:45 | 02:55 | 10 | 1229 | Saharsa JN |
| SOU | 3 | 04:00 | 04:00 | 0 | 1256 | Supaul |
04060 chart preparation time
The first reservation chart for 04060 is usually prepared at least 10 hours before departure. For its scheduled departure at 21:35 from NEW Delhi, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: