03131 train SDAH-GKP SPL
03131 starts from SDAH (Sealdah) at 23:50 and reaches GKP (Gorakhpur JN) at 18:00 covering a distance of 797 kms and 19 stations. 03131 is scheduled to run on Thu at 23:50 from SDAH Sealdah station to reach GKP Gorakhpur JN at 18:00.
- Train Number: 03131 Name: SDAH-GKP SPL (सियालदह गोरखपुर स्पेसल)
- Type: TOD (TRAIN ON DEMAND) covering 797 kms in 18 hours 10 mins
- Frequency: Runs 1 days Thu
- Route: Sealdah (SDAH) to Gorakhpur JN (GKP).
- Major Stops: JAJ (Jhajha), BJU (Barauni JN), HJP (Hajipur JN), CPR (Chhapra), SV (Siwan JN)
- Coaches: Coach details will be available once the train schedule is finalized.
03131 train route, schedule and stations time table
| Code | Day | Arrival | Departs | Halt | KMs | Station |
|---|---|---|---|---|---|---|
| SDAH | 1 | 23:50 | 23:50 | 0 | 0 | Sealdah |
| NH | 2 | 00:40 | 00:42 | 2 | 41 | Naihati JN |
| BDC | 2 | 01:12 | 01:14 | 2 | 50 | Bandel |
| BWN | 2 | 02:04 | 02:06 | 2 | 118 | Bardhaman |
| DGR | 2 | 03:06 | 03:08 | 2 | 181 | Durgapur |
| ASN | 2 | 03:38 | 03:41 | 3 | 223 | Asansol JN |
| CRJ | 2 | 04:04 | 04:06 | 2 | 248 | Chittaranjan |
| MDP | 2 | 04:43 | 04:45 | 2 | 304 | Madhupur JN |
| JSME | 2 | 05:10 | 05:12 | 2 | 333 | Jasidih JN |
| JAJ | 2 | 06:55 | 07:00 | 5 | 377 | Jhajha |
| KIUL | 2 | 07:48 | 07:50 | 2 | 431 | Kiul JN |
| BJU | 2 | 10:15 | 10:25 | 10 | 470 | Barauni JN |
| SPP | 2 | 11:10 | 11:12 | 2 | 520 | Shahpur Patoree |
| HJP | 2 | 12:05 | 12:10 | 5 | 558 | Hajipur JN |
| SEE | 2 | 12:20 | 12:22 | 2 | 564 | Sonpur JN |
| CPR | 2 | 14:15 | 14:20 | 5 | 617 | Chhapra |
| SV | 2 | 15:20 | 15:25 | 5 | 678 | Siwan JN |
| DEOS | 2 | 16:30 | 16:32 | 2 | 748 | Deoria Sadar |
| GKP | 2 | 18:00 | 18:00 | 0 | 798 | Gorakhpur JN |
03131 chart preparation time
The first reservation chart for 03131 is usually prepared at least 10 hours before departure. For its scheduled departure at 23:50 from Sealdah, passengers can expect the final status to be updated well in advance under the latest 10-hour charting rules.
Based on Indian Railways regulations, the First Reservation Chart for morning trains is typically prepared by 08:00 PM the previous evening. For all other departures, the first chart is finalized at least 8-10 hours before the scheduled start time.
The Second and Final Reservation Chart is prepared 30 minutes before the train departs from the charting station. Any last-minute changes or current bookings are reflected only in this final chart.
Train data refreshed on: